Submarine, carrier and cutter contracts are moving forward. So is the work of keeping today's fleet in service. The two draw on different pieces of shipyard capacity, and sometimes on the same people. Here is how to plan for both.

10 min read • October 2026
14 submarines
Placed under contract in July 2026: nine Block VI Virginia-class and five Build II Columbia-class boats, in contract modifications totaling about $76.6 billion to HII Newport News Shipbuilding and General Dynamics Electric Boat
Nearly one-third
Of all maintenance and modernization in an aircraft carrier's service life is performed during its refueling and complex overhaul (RCOH). HII received a $5.1 billion contract for the USS Harry S. Truman RCOH on Sept. 29, 2026.
33 percent
Of the Navy's attack submarine fleet was undergoing or awaiting maintenance, against a Navy goal of no more than 20 percent
$179 million
In Coast Guard cutter maintenance deferred in fiscal year 2024, a 264 percent increase from about $49 million in fiscal year 2018
Sources: HII, "HII is Awarded Contracts for Construction of Block VI Virginia-class and Build II Columbia-class Submarines" (July 29, 2026; contracted, construction extends into future years); HII, "HII is Awarded Contract to Execute USS Harry S. Truman (CVN 75) Refueling and Complex Overhaul" (Sept. 29, 2026); Congressional Budget Office, testimony on challenges facing the Navy's and Coast Guard's shipbuilding programs and the shipbuilding industrial base (Apr. 22, 2026); U.S. GAO, GAO-25-107222 (June 25, 2025).

Key Takeaways

  • What is accelerating across Navy and Coast Guard programs is mainly procurement, contracting and investment. Deliveries on several major programs remain behind schedule, so the acceleration shows up first as future workload, not finished ships.
  • The existing fleet carries its own large workload. CBO and GAO have documented submarine maintenance backlogs, surface ship maintenance that often runs long, and growing deferred maintenance on Coast Guard cutters.
  • Some yards do both kinds of work. Newport News Shipbuilding, for example, reached preliminary acceptance on a new carrier and received a carrier overhaul contract on the same day in September 2026.
  • New-build capacity, repair capacity and workforce capacity are related but not interchangeable. A dry dock suited to repair, a production line for modules and a crew of qualified pipefitters are different resources with different lead times.
  • Workforce plans hold up best when they are built from funded and contracted work on both sides, by trade and by phase, with recruiting started well before construction peaks or availability start dates.

When Navy and Coast Guard shipbuilding makes news, the story is usually about new hulls: a large submarine contract, a new class of icebreaker, a record budget request.

That is one side of the work. The other side gets less attention. Every submarine, carrier, destroyer and cutter already in service needs maintenance, repair and modernization, and many classes also go through major overhaul or service-life extension at planned points in their lives. That work also requires dry docks, waterfront, suppliers and skilled trades.

Both sides are moving at once. In the past year, the Navy has placed 14 new submarines under contract and awarded a contract for another carrier overhaul. The Coast Guard has contracted for 11 Arctic Security Cutters while working through a growing maintenance backlog on cutters that are decades old.

This article looks at how those two workloads relate. The central question for shipyard and marine industry leaders is practical: as programs move forward, how do you plan capacity and workforce for building new vessels and sustaining existing ones at the same time?

Capacity Is About More Than Building New Ships

The word "accelerate" deserves precision. Based on current evidence, here is what is speeding up and what is not.

Advancing

  • Contracting. In July 2026, the Navy awarded contract modifications for nine Virginia-class and five Columbia-class submarines. Between December 2025 and February 2026, the Coast Guard awarded contracts for 11 Arctic Security Cutters, describing its direction as "accelerating construction of these cutters."
  • Investment. The One Big Beautiful Bill Act, enacted in July 2025, provided the Coast Guard nearly $25 billion, which the service called the largest single funding commitment in its history.
  • Requested funding. The Navy's FY2027 budget request seeks $65.8 billion for shipbuilding. That is a request, not enacted funding.

Not Yet Accelerating

  • Deliveries. GAO reported in April 2026 that none of the seven shipbuilders building Navy battle force ships was positioned to meet the Navy's delivery goals, and that Virginia-class production was running at about one boat per year as of June 2025, half the Navy's goal of two.

So the acceleration is real, but it is concentrated in contracts and funding. That matters for capacity planning, because contracted work becomes yard workload over years, and it arrives on top of the work the existing fleet already requires.

CBO put the relationship plainly in April 2026 testimony:

"A larger fleet would place greater demands on not only the shipyards that construct new ships but also those that maintain the Navy's existing ships."

That is the core idea of this article. Maritime capacity has two sides, and each needs its own kind of capacity:

New-Construction CapacityRepair and Maintenance CapacityWorkforce Capacity
Fabrication and module productionDry dock and waterfront availabilitySkilled trades by craft
Assembly and outfitting spaceRepair facilities and equipmentProject-specific experience
Build positions and launch facilitiesMaintenance planning and schedulingTraining and qualification pipelines
Production equipmentModernization and installation capabilityAvailability by project phase
Supplier capability for new componentsSubcontractor capability, parts and materialsAbility to shift between projects

These are not interchangeable. A yard with open dry dock time does not automatically have new-construction capacity, and a new module facility does not add repair capacity. The workforce column connects them, because trades such as welders, shipfitters and pipefitters appear on both sides.

Workforce implication: Before forecasting labor, separate the work into what is being built and what is being sustained. They follow different schedules and use capacity differently.

New Construction Creates Long-Term Production Requirements

New construction programs create demand that stretches across years and changes as each hull moves through production.

Navy submarines: contracted and in production. The July 2026 awards cover nine Block VI Virginia-class and five Build II Columbia-class submarines. HII reported that Newport News Shipbuilding will serve as the delivery yard for six of the Virginia-class boats and builds six module sections for each Columbia-class submarine. The same release noted that the contracts include other funding for shipyard infrastructure.

These are multi-year commitments. Work under the new contracts adds to boats already in production, and GAO reported in April 2026 that the lead Columbia-class submarine was at least 18 months behind its contract delivery date.

Navy carriers: in production. HII reported that the future USS John F. Kennedy (CVN 79) reached preliminary acceptance on Sept. 29, 2026, the final step before formal delivery to the Navy.

Coast Guard cutters: several programs at different stages.

  • Polar Security Cutter (under construction). At Bollinger's Pascagoula, Mississippi, yard, July 2026 congressional testimony cited by USNI News put 33 of the lead ship's 85 modules under construction. USNI reported that delivery is expected in fiscal year 2030, with the second and third ships following in 2032 and 2034.
  • Arctic Security Cutter (contracted; U.S. construction started). The Coast Guard has awarded contracts for 11 cutters across three builders, with some built in Finland and some in the United States. USNI News reported that steel work on the first U.S.-built hull began in April 2026 at Bollinger facilities in Louisiana, with sections built across several Gulf Coast yards.
  • Fast Response Cutter (in production). In September 2025, the Coast Guard exercised a $507 million option for 10 more Fast Response Cutters from Bollinger, raising the program of record to 77, with first delivery under the new option expected in fiscal year 2028.
  • Offshore Patrol Cutter (in transition). USNI News reported in June 2026 that the Coast Guard and Eastern Shipbuilding terminated the Stage 1 contract. Stage 2 construction continues at Austal USA in Mobile, Alabama, with the fifth OPC scheduled to deliver in 2027.

New construction requires more than a building way. It depends on fabrication and outfitting space, supplier capability for long-lead components, and a workforce whose craft mix shifts as a ship moves from steel work toward systems installation and testing. GAO reported in April 2026 that "both Navy and Coast Guard shipbuilders face challenges training, recruiting, and retaining trades workers, such as welders, pipefitters, and machinists."

New programs also do not land evenly. A submarine contract affects Groton, Newport News and their suppliers. Cutter awards concentrate along the Gulf Coast. Many other yards will see no direct change.

Workforce implication: New construction demand builds over years and changes by phase. Plan around the production milestones in the contract, not the award announcement.

Existing Fleets Still Require Shipyard Capacity

While new hulls are being built, the ships already in service keep coming back to the yards. That work runs on its own schedule and uses capacity in its own way.

Navy nuclear maintenance: concentrated at public shipyards. CBO testified in April 2026 that the four public naval shipyards "perform nearly all the maintenance on the Navy's nuclear-powered aircraft carriers and submarines, and they have struggled to meet the Navy's goals, particularly those for the attack submarine force." CBO reported that 33 percent of the attack submarine fleet was undergoing or awaiting maintenance, against a goal of no more than 20 percent.

Dry dock capacity is one documented constraint. GAO reported in August 2026 that attack submarines have lost more than 15,000 operational days to maintenance delays over the past decade, and that submarines designated for decommissioning are waiting because shipyards lack the dry dock capacity to begin that process. GAO projected that 15 attack submarines could enter that inactive waiting status from fiscal years 2026 through 2030.

The Navy is rebuilding that capacity, but on a long timeline. GAO reported in September 2026 that new dry docks are under construction at Portsmouth and Pearl Harbor naval shipyards and in final design at Puget Sound, at a combined estimated cost of about $21.7 billion.

Navy surface ship repair: performed largely by private companies. CBO reported in December 2025 that most maintenance for conventional Navy ships is performed under contract at private shipyards. GAO reported that, as of May 2024, 12 companies conducted major repair periods across five fleet concentration areas: Mayport, Norfolk, Pearl Harbor, San Diego and Seattle/Everett.

CBO found that maintenance on destroyers and amphibious ships often takes 20 to 100 percent longer than the Navy's final schedules, with unplanned "new work" and "growth work" among the contributing factors. CBO also found that maintenance and modernization contracts are separate and originate in two different Navy organizations, which can make the two hard to coordinate inside the same availability.

Carrier overhaul: a defined, multi-year event. A refueling and complex overhaul happens once, at the midpoint of a carrier's planned service life. HII describes it as nearly a third of all maintenance and modernization in a carrier's life. The Truman RCOH, awarded in September 2026, covers reactor refueling, modernization across thousands of compartments and tanks, propulsion plant upgrades and combat systems work. HII reported that Truman will be the eighth Nimitz-class carrier to undergo RCOH at Newport News.

Coast Guard sustainment: an aging fleet with growing maintenance needs. GAO reported that, as of January 2025, the Coast Guard operated 241 cutters, some deployed well beyond their design service lives. The Coast Guard deferred about $179 million in cutter maintenance in FY2024, and instances of serious maintenance issues rose 21 percent from FY2018 to FY2023.

The Coast Guard's In-Service Vessel Sustainment program decides class by class which cutters need major maintenance availabilities or service-life extensions. That work is performed at the Coast Guard Yard in Curtis Bay, Maryland, which GAO describes as the service's sole shipbuilding and major repair facility, and at commercial shipyards. Current projects listed by the Coast Guard include:

  • Service-life extension of 270-foot medium endurance cutters, in full production since 2023
  • Major maintenance availabilities for 175-foot coastal buoy tenders, started on the first of 14 cutters
  • A five-year phased service-life extension for the icebreaker Healy, scheduled to start in 2027
  • Major maintenance planning for the 418-foot National Security Cutters

Recently completed work includes the Polar Star service-life extension, which left dry dock in September 2025.

Workforce implication: Sustainment work is not filler between new builds. It is a defined workload with its own schedule, scope risk and trade requirements.

New Construction and Repair Can Compete for Different Pieces of Capacity

Not every shipyard does both kinds of work. Some build new ships. Some focus on repair. Some do both. Where both types of work meet, at a single yard or in a single region, they can draw on some of the same resources.

One yard, both workloads. On Sept. 29, 2026, Newport News Shipbuilding announced preliminary acceptance of the new carrier John F. Kennedy and a $5.1 billion contract to overhaul the Harry S. Truman. The same yard is a delivery yard for Virginia-class submarines and a module builder for Columbia-class boats. In a yard like this, new construction and overhaul run side by side, each with its own schedule.

A documented trade-off. In April 2026, the Navy announced it would inactivate the attack submarine USS Boise rather than complete its long-delayed overhaul at Newport News. Chief of Naval Operations Adm. Daryl Caudle said the decision "allows us to reallocate America's highly-skilled workforce to our highest priorities: delivering new Virginia and Columbia-class submarines and improving the readiness of the current fleet." That statement concerns one submarine and one decision. It is still a clear example of new construction and repair drawing on the same skilled workforce.

Dry docks and waterfront. The constraint is not uniform. At the public shipyards, GAO has documented limited dry dock capacity for submarine work. In private surface ship repair, GAO reported that company representatives in every fleet concentration area said "they often had more infrastructure capacity than the Navy was using," while noting that "there is not always sufficient infrastructure capacity available to manage unplanned repair work, such as growth work or emergent repairs." Infrastructure capacity depends on the type of work, the location and whether the work was planned.

Workforce in specific locations. GAO reported that the Navy estimates its planned surface ship repair workload could exceed ship repair companies' workforce capacity in San Diego, Mayport and Pearl Harbor at some times through fiscal year 2031, "if workforce capacity does not change from current levels." That is a location-specific, conditional estimate, not a finding about every repair market.

Workload stability. GAO also reported Navy officials' view that repair workload instability "could result in a reduction of the amount of available workforce as repair companies may reduce the size of their workforce when the workload is projected to dip." Uneven repair schedules can make it harder to keep experienced people in place for the next surge.

Scheduling and contract timing. CBO found that maintenance contracts are sometimes awarded only one or two months before work starts, which gives shipyards "less time to order parts or hire workers." For a yard balancing new-build production with incoming availabilities, short notice on one side affects the other.

Suppliers and subcontractors. Both sides depend on outside suppliers and subcontractors. GAO has reported that many shipbuilding suppliers have their own workforce and infrastructure problems. Repair work also relies on subcontractors for specialized scopes. A prime yard's plan can look balanced while a key subcontractor's does not.

Leaders evaluating capacity can ask: Which of these resources does each project actually use? Where do the same dry docks, crews or suppliers show up on more than one schedule? And which of those overlaps are documented constraints versus risks to watch?

Workforce implication: Where new construction and repair share a yard or region, the overlap is most likely to show up in specialized trades, experienced supervisors and scheduling, not across every resource at once.

Quick Assessment

New Build vs. Repair Workforce Planning

Workforce needs can look very different by project type. These are general planning considerations, not industry benchmarks.

New ConstructionRepair / Modernization
Multi-year production timelinesDefined availability windows
Multiple production phasesProject-specific work scopes
Craft mix shifts from structural to outfitting and testCraft mix depends on the work package
Planned workforce ramp tied to milestonesScope can grow once work begins
Supplier lead times for new componentsContract timing can compress hiring windows

How to use it: Place each upcoming project in one column, then compare the trade peaks. Overlap between columns is where planning attention matters most.

Workforce Planning Has to Follow the Work

The practical response is visibility. A workforce plan that reflects both sides of the yard starts from the actual work on the schedule.

Start with funded and contracted work. Separate contracted construction, scheduled availabilities and planned modernization from work that is only requested or proposed. The FY2027 shipbuilding request, for example, signals future demand but is not yet workload.

Forecast by trade and by phase. New construction often moves from structural fabrication toward pipefitting, electrical and systems work as outfitting progresses. Repair and modernization scopes vary by ship and availability. A single headcount number hides those differences.

Expect schedules to move. CBO's maintenance findings and GAO's construction findings both show that schedules shift. When an availability runs long or a construction milestone slips, overlap between projects can appear where none was planned.

Watch the shared trades. Welders, shipfitters, pipefitters, marine electricians, machinists and riggers can be needed on both new construction and repair. The experienced leads who supervise them are often the hardest to add.

Give recruiting real lead time. GAO reported that shipbuilder documentation shows it takes 3 to 5 years for an employee to gain proficiency in the skilled trades. Recruiting that begins at contract award or availability start, especially when awards arrive late, leaves little room for qualification and onboarding.

Include subcontractors. Subcontractors and suppliers may have separate workforce requirements and timelines. Their gaps can become the prime yard's delays.

Build in flexibility. A mix of core employees and supplemental craft labor can help a yard scale between construction phases and availability windows without losing the experienced people it depends on.

None of this assumes every yard is overloaded. It means capacity planning has to count the ships already in service along with the ships being built.

Quick Assessment

Is Your Workforce Plan Accounting for Both Sides of the Yard?

Consider your next 12 to 24 months:

  1. What new-construction work is funded, contracted and scheduled?
  2. What repair, maintenance or modernization work is scheduled?
  3. Where do those timelines overlap?
  4. Which trades does each phase of each project require?
  5. Which specialized skills may be needed on more than one project at the same time?
  6. When does recruiting need to begin to meet those dates?
  7. Are subcontractor workforce needs included in the plan?

Plan for the Work on Both Sides of the Yard

New hulls and existing-fleet availabilities run on different clocks and call for different crews. NSC Marine supports shipbuilding, repair, conversion and dry-dock work with skilled trades including welders, shipfitters, pipefitters, electricians, fabricators, firewatch, blaster/painters and riggers. If you are mapping upcoming construction and repair schedules, we can help you think through which trades you will need and when.

EXPLORE MARINE STAFFING REQUEST TALENT
shipbuilding and ship repair capacity ship repair capacity Navy ship maintenance Coast Guard cutter programs shipyard repair workforce NSC Marine

Frequently Asked Questions

Shipbuilding capacity covers what a yard needs to build new vessels: fabrication and assembly space, outfitting, production equipment, suppliers and a workforce that changes by production phase. Repair capacity covers dry dock and waterfront availability, repair facilities, maintenance scheduling, modernization capability, subcontractors and parts. They overlap in skilled trades but are not interchangeable.

Mainly contracting and investment. The Navy contracted for 14 submarines in July 2026, and the Coast Guard has contracted for 11 Arctic Security Cutters and received nearly $25 billion under the One Big Beautiful Bill Act. Deliveries on several programs remain behind schedule, according to GAO.

According to CBO, most maintenance for conventional Navy ships is performed under contract at private shipyards, while the four public naval shipyards perform nearly all maintenance on nuclear-powered carriers and submarines. Some private yards that build nuclear ships also perform overhauls, such as carrier RCOHs at Newport News Shipbuilding.

It can, where both share a yard or region. In April 2026, the Navy said inactivating USS Boise would let it reallocate skilled workers to new submarine construction and fleet readiness. GAO has also estimated that planned surface ship repair work could exceed repair companies' workforce capacity in San Diego, Mayport and Pearl Harbor at some times through FY2031 if capacity stays at current levels.

Start with funded and contracted work on both sides, forecast labor by trade and phase, and look for windows where schedules overlap. Because GAO reports skilled trades take 3 to 5 years to reach proficiency, recruiting for shared trades should begin well before construction peaks or availability start dates.